Showing posts with label Jörg. Show all posts
Showing posts with label Jörg. Show all posts

08 October 2014

News from Nelson - October 2014

Hi all,
Long time, no post.

Things have been a bit chaotic, this last six months, really: what with getting the thesis in and then what has practically been two full time jobs. I haven't done a family update for a LONG time. Things have been so busy here this year, that all sorts of things have slipped. A bit mad.

So let's roll the clock back and tell the story of the last six months.

Jan had a lovely birthday celebration with friends and my family at a German restaurant in Nelson last month. He got spoilt with lots of lovely presents, including a MS Surface (tablet) from me, and a copy of Bradshaw's Continental Railway Guide from 1913, complete with fold out maps. Very cute.

My Masters was submitted on 26 June, but I had not heard anything back by September. I then got an invite at the beginning of September from Auckland Uni inviting me to the graduand's dinner. So I contacted the PostGrad Co-ordinator and asked if my results were back yet - that I figured I would only be getting an invite if I had passed. Response was an "oops, that's a mistake", and a "sorry we haven't got your results back yet. As you weren't going to graduate until May next year, you got put [on the slow boat]". OK, so I have waited another three weeks, and just sent off a hurry-up email today. I hope all this delay doesn't mean bad news :-(
It was crazy in the lead-up to getting my Masters in. There were so many things to get done with the final report, my teaching, my brother's wedding in Rarotonga, my Father's 80th, meeting our 'lost' cousin, and the skullduggery of getting my Uncle here from Australia in secret for my Father's shindig, Joerg's birthday and having Otto & Lara here that I don't feel I have had time to draw breath since the gallop began in January. I have only been teaching one paper for NMIT, one for AUT per semester over the past two years, while I completed my Masters; that's about a half-time teaching load (as well as career clients). The idea was to have a staged return to work from July where I increased my revenue and got back up to full-time speed.




However, since the start of Semester 2 in July, I have been very, very busy working for NMIT. The Head of School resigned in February, and one of our Management lecturers, John, replaced him (a very good choice, too). John tried to keep teaching all his papers, but had to admit defeat due to workload, so a lecturer who was waiting for the bulk of his Postgrad courses to start in semester 2 (doing project work in the meantime), finished two of John's courses off. Planning immediately started on reallocating John's teaching and him only taking one paper per semester in future (he wants to keep thoroughly in touch with teaching practice, keeping it fresh and top of mind). This left three papers needing a home. One I coveted, and thought that would make a great addition to my two existing teaching papers. All good.

Then suddenly in the semester break, another Management lecturer resigned. Eeek! This meant there were now 7 papers needing a home, a week out from the start of the new semester. But wait, there's more! NMIT is reducing costs - they, like most ITPs, are being starved of cash by central Government. So either through attrition or redundancy, costs must be cut. So we effectively have a sinking lid policy, and didn't get go-ahead to hire replacement lecturers. Three management lecturers left: seven papers. I took on two more papers.

Things went from having a bit of a rest after the madness of getting my Masters in, to total chaos. I had to rewrite two papers 'in my own image' so that I could teach them: one online, and one face to face (now known as 'F2F'!). One had been an online paper that I had set up originally, but the world has moved on since that was done three years ago. However, previous incumbent had left it un-updated, disorganised, not in the current teaching model, using old technology, and worded in a very autocratic manner. This took me until a month ago to get up to current standards, well resourced, friendly and for me to get my head around the new requirements of teaching online, and au fait with the new tools and policies.

My second paper, a 30 credit research paper, has me mentoring year 3 students doing their capstone management research projects. I love it! But John, who taught this before me, teaches by telling stories, and had few resources aside from the PowerPoints from the textbook: he was the resource, and had very little online on the course site.

My teaching approach is to have a blended course: lots of resources online so students can seek their own resources from the resource bank, which includes recorded lectures, readings, exemplars and software. It took until mid-September to get this course written, resourced and the lectures recorded and posted.

Oh, and I have an NZQA moderation to prepare for on one new paper, and an external moderation on the other, both for this semester. So things have to be absolutely spot on for both courses. No pressure! I am so thankful that I habitually tweak my courses as I go to keep them up to date, because the two I already had at the start of this semester needed very little attention from me aside from me turning up to deliver familiar material. They saved me from total overload.

And then, to top things off, both Jan & I got sick. We both got the flu that was going around, and each spent four days in bed. Luckily I got the flu on a non-teaching day, Thursday, and only missed one day of lectures; the Friday. I was walking wounded for my next teaching day; Tuesday. I think I under-performed for around two weeks - dog tired, coughing, fevers, headaches - before I shook it off. Jan too took a long time to recover - and in fact is still suffering from phlegmy throats.

A month ago, at last, I finally got some time to draw breath. I had worked 50 days straight from the beginning of the semester before I got a half day off that wasn't a sick day. Now I am able to focus on marking, teaching and small course tweaks to keep everything up to date across the four papers. I also have time now for my other clients and my role as the Treasurer and Comms Director of CDANZ. Things are still busy, but are now do-able.

Jan too has been very busy. With the changes in the H&S in Employment Act coming into force next April, Nelson Pine has lots of things that need to be planned and enacted. Jan is also heading away next week on a residential NZIM management course in Chch, out at the Airport Commodore.

Other news: Warren, Tracy & Erica have moved to Nelson, and are living 15 minutes away in Cotterel Road. We have caught up a few times, including a wonderful Election Night Special with them, Murray, Julie & Janet at our place with cocktails, pool playing, music and half an eye on the election with the sound off. Great fun was had by all. Hopefully Janet will email some photos other than the panorama photo I took from the top of Christian's driveway.

We had a great time at Jörg's birthday party in Morrinsville earlier in the year (and hopefully some who were there will email some photos); my cousin has been up to stay from Dunedin (and hopefully will email me her photos)... hmm. Sound like a theme happening here?

We have caught up with Jenny L a few times, which has been great, and Kathleen, Frits and Amy came out and we had a mid-winter Christmas celebration in mid-July before the semester started which was very enjoyable. Otto and Lara came to stay in the break as well, and it was lovely having them here (we are hoping to have them here again in late December, early January for another week).

Magda had a car accident in August, being struck by a 4WD driver on a one lane bridge on the Lewis Pass. Luckily she was unhurt, though her car was written off. As she was heading off to Holland to visit family soon after the accident, she decided not to replace her car until she got back to Kiwiland. She got back last week, and is now in the exciting phase of road-testing new cars. I hope her good judgement is on hyper-sensitive!

I am also about to have an article published in the Canadian Career's publication, and about to start some new research on Applicant Tracking Software with a local HR company. That too should result in an article or two.

Dogs are well. Jan has a new Motorbike on the way (Triumph Tiger).

Right. I know I have forgotten lots, but that will do for this time. More in a few weeks :-)

All the best


Sam & Jan


16 February 2012

News from Nelson - February 2012


Hi all,
Wow – here we are a sixth of the way through the year already! How did it get to be mid-February so fast?!




Brigitte appears to be recovering well from her hip replacement in Germany, and Jörg is slowly making progress following his head injury. My brother got swarmed by a wasps nest recently when mowing the lawn. He appears to be OK, but that is not the nicest experience either. He was very lucky. 

I had a minor fall – Coco towed me over on the neighbour’s steep gravel driveway, leaving me with lots of bits of gravel to pick out. Thank goodness for Christian’s high pressure winery hose – that cleaned the bits out pronto :-)

As I write I am reading over what we were doing last time I wrote; and I am pretty much at the same space! I am still trying to commission my new PC. Jan has finished building shelves in the cellar – though; and they look great. 

I have pegged back my teaching for this year; only teaching three papers, and they are all now underway. I am still trying to mop up summer school though. Getting there, but it feels like the mountain is very big at the moment.

Each week I have been helping the Nelson Symphony Orchestra secretary set up some new systems. Their previous secretary, who basically carried the whole shebang for several years, recently left. No one knows how to do anything as everything was in his head. At least while we are reinventing everything, we are writing it all down, and putting it into Google docs, so that everyone can access everything.  

We are definitely now driving the Rotary International exchange teenagers around the North Island at Easter for my birthday. Camila, Ana's sister, is here from Brazil, and is coming to stay this Friday night with us. We are going into Able Tasman on Saturday for a day cruise in and a walk – or part walk, part cruise – out, depending on the weather. I hope Camila enjoys the dogs as much as Ana did.
Last weekend we had a great time up in Wellington. Jan had lunch with Doug, and Hui-Ping came around to Tina & Jeremy’s along with Pae-Ling, whom I vaguely remember from Auditing class many years ago. It was great to see everyone. We had a lovely family brunch on Sunday morning too, with Hartmut and Uta, and another friend of theirs. Tina & I tried to take a run – well, Tina did, and I puffed along beside until nearly asphyxiating and having to walk! I was up for a CDANZ Exec meeting, and so had eleven hours of meetings in two days. It was a bit full on – I got a pretty bad migraine on the way home, so will have to cut down what I try to fit in while I am up in Welly.

Kathleen & Frits came to stay at our place for a weekend, which was really fun, and we had Erin, Simon & wee Isla up for a meal while they were on holiday in Nelson. 

Right, that's it for now – this weekend we have the Abel Tasman trip, and a Roses Road BBQ on Sunday. Then I am ensuring that we don’t add any more back in for the next two weeks!

* Justine – the earphones arrived perfectly! Send your CV!

All the best - hope to hear from you all soon!


Jan Kuwilsky & Sam Young